long leaders

Discussion in 'Flathead Catfish' started by slikk03, May 4, 2009.

  1. slikk03

    slikk03 New Member

    Messages:
    2,507
    State:
    illinois
    ok i use the three way rig 6 inches for the bait, 2 foot for the weght, is that good or does this matter,here agin this is keeping your bait 2 foot off the bottem, any segestions on the ideal lenth of your drop should be, i figer if there laying in the mud you would want to use a six inch drop, i dont know if this matters at all realy, so in a way im almost using a float by doing this, exept im not drifting